Tender & Sebut Harga


Tarikh Terbitan : 2026-03-05

MEMBEKAL DAN MENGHANTAR ADVANCE PRESSURE MANAGEMENT CONTROL (APMC) SERTA KERJA-KERJA LAIN YANG BERKAITAN KEPADA SYARIKAT AIR DARUL AMAN SDN. BHD. (SADA)

Fail Berkaitan : SADA/TEN/NRW/12/2026


Tarikh Terbitan : 2026-03-05

KERJA-KERJA MEMBEKAL DAN MEMASANG PAIP HDPE BERSAIZ 180MM dia. BAGI MENGGANTIKAN PAIP SEDIA ADA SEPANJANG 1700 METER (m) SERTA KERJA-KERJA BERKAITAN DI TAMAN SELASIH, KULIM, KEDAH DARUL AMAN

Fail Berkaitan : SADA/TEN/NRW/11/2026


Tarikh Terbitan : 2026-03-05

KERJA-KERJA MEMBEKAL DAN MEMASANG PAIP HDPE BERSAIZ 180MM dia. BAGI MENGGANTIKAN PAIP SEDIA ADA SEPANJANG 1500 METER (m) SERTA KERJA-KERJA BERKAITAN DI PEKAN RELAU, BANDAR BAHARU, KEDAH DARUL AMAN

Fail Berkaitan : SADA/TEN/NRW/10/2026


Tarikh Terbitan : 2026-03-05

KERJA-KERJA MEMBEKAL DAN MEMASANG PAIP MSCL BERSAIZ 150MM dia. BAGI MENGGANTIKAN PAIP SEDIA ADA SEPANJANG 400 METER (m) SERTA KERJA-KERJA BERKAITAN DI JALAN PECAH BATU, KULIM, KEDAH DARUL AMAN

Fail Berkaitan : SADA/SH/NRW/19/2026


Tarikh Terbitan : 2026-03-04

KERJA-KERJA MEMBEKAL DAN MEMASANG PRESSURE REDUCING VALVE (PRV) TIMER (FULL BORE) BERSAIZ 800MM, SINGLE POINT INSERTION (SPI) DAN LAIN-LAIN KERJA BERKAITAN DI KOLAM BUKIT TINGGI, ALOR SETAR, KEDAH DARUL AMAN

Fail Berkaitan : SADA/TEN/NRW/09/2026


Tarikh Terbitan : 2026-03-04

KERJA-KERJA MEMBEKAL DAN MEMASANG PRESSURE REDUCING VALVE (PRV) TIMER (FULL BORE) BERSAIZ 700MM, SINGLE POINT INSERTION (SPI) DAN LAIN-LAIN KERJA BERKAITAN DI KOLAM BUKIT PINANG (RA-RB), ALOR SETAR, KEDAH DARUL AMAN

Fail Berkaitan : SADA/TEN/NRW/08/2026


Tarikh Terbitan : 2026-03-03

KERJA-KERJA MEMBEKAL DAN MEMASANG PAIP BERSAIZ 180MM dia. JENIS HDPE SEPANJANG 1000 METER DAN KERJA-KERJA BERKAITAN BAGI MENGGANTIKAN PAIP DI KAMPUNG TELOK DURIAN, KUPANG, DAERAH BALING, KEDAH DARUL AMAN

Fail Berkaitan : SADA/SH/NRW/18/2026


Tarikh Terbitan : 2026-03-03

KERJA-KERJA PEMBINAAN RUMAH PAM, TANGKI SEDUTAN DAN PEMASANGAN PAM SERTA KERJA-KERJA YANG BERKAITAN DI KAMPUNG BUKIT KECHIL, KOTA KUALA MUDA, KEDAH DARUL AMAN

Fail Berkaitan : SADA/SH/NRW/17/2026


Tarikh Terbitan : 2026-02-26

KERJA-KERJA MEMBEKAL DAN MEMASANG DUA BELAS (12) UNIT DISTRICT METERING AREAS (DMA), PRESSURE REDUCING VALVE (PRV) DAN ADVANCE PRESSURE MANAGEMENT SISTEM (APMS) SERTA KERJA-KERJA BERKAITAN DI DAERAH POKOK SENA DAN PADANG TERAP KEDAH DARUL AMAN

Fail Berkaitan : SADA/TEN/NRW/07/2026


Tarikh Terbitan : 2026-02-26

KERJA-KERJA MEMBEKAL DAN MEMASANG SEPULUH (10) UNIT DISTRICT METERING AREAS (DMA), PRESSURE REDUCING VALVE (PRV) DAN ADVANCE PRESSURE MANAGEMENT SISTEM (APMS) SERTA KERJA-KERJA BERKAITAN DI AYER HITAM KEDAH DARUL AMAN

Fail Berkaitan : SADA/TEN/NRW/06/2026


Tarikh Terbitan : 2026-02-26

KERJA-KERJA MEMBEKAL DAN MEMASANG TUJUH (7) UNIT DISTRICT METERING AREAS (DMA), PRESSURE REDUCING VALVE (PRV) DAN ADVANCE PRESSURE MANAGEMENT SISTEM (APMS) SERTA KERJA-KERJA BERKAITAN DI DAERAH SUNGAI PETANI (UTARA) KEDAH DARUL AMAN

Fail Berkaitan : SADA/TEN/NRW/05/2026


Tarikh Terbitan : 2026-02-26

KERJA-KERJA MEMBEKAL DAN MEMASANG SEMBILAN (9) UNIT DISTRICT METERING AREAS (DMA), PRESSURE REDUCING VALVE (PRV) DAN ADVANCE PRESSURE MANAGEMENT SISTEM (APMS) SERTA KERJA-KERJA BERKAITAN DI DAERAH SUNGAI PETANI (SELATAN) KEDAH DARUL AMAN

Fail Berkaitan : SADA/TEN/NRW/04/2026


Tarikh Terbitan : 2026-02-26

KERJA-KERJA MEMBEKAL DAN MEMASANG TUJUH (7) UNIT DISTRICT METERING AREAS (DMA), PRESSURE REDUCING VALVE (PRV) DAN ADVANCE PRESSURE MANAGEMENT SISTEM (APMS) SERTA KERJA-KERJA BERKAITAN DI DAERAH BALING DAN SIK, KEDAH DARUL AMAN

Fail Berkaitan : SADA/TEN/NRW/03/2026


Tarikh Terbitan : 2026-02-26

KERJA-KERJA MEMBEKAL DAN MEMASANG LIMA (5) UNIT DISTRICT METERING AREAS (DMA), PRESSURE REDUCING VALVE (PRV) DAN ADVANCE PRESSURE MANAGEMENT SISTEM (APMS) SERTA KERJA-KERJA BERKAITAN DI DAERAH KULIM, KEDAH DARUL AMAN

Fail Berkaitan : SADA/TEN/NRW/02/2026


Tarikh Terbitan : 2026-02-24

MEMBEKAL DAN MENGHANTAR PAIP HIGH-DENSITY POLYETHYLENE (HDPE) KEPADA SYARIKAT AIR DARUL AMAN SDN. BHD. (SADA) BAGI TEMPOH SATU (1) TAHUN

Fail Berkaitan : SADA/SH/PA/15/2026


Tarikh Terbitan : 2026-02-24

MEMBEKAL DAN MENGHANTAR PERALATAN SLUICE VALVE, BUTTERFLY VALVE DAN AIR VALVE KEPADA SYARIKAT AIR DARUL AMAN SDN. BHD. (SADA) BAGI TEMPOH SATU (1) TAHUN

Fail Berkaitan : SADA/SH/PA/14/2026


Tarikh Terbitan : 2026-02-24

MEMBEKAL DAN MENGHANTAR PAIP MILD STEEL CEMENT LINING (MSCL) DAN KELENGKAPANNYA KEPADA SYARIKAT AIR DARUL AMAN SDN. BHD. (SADA) BAGI TEMPOH SATU (1) TAHUN

Fail Berkaitan : SADA/SH/PA/13/2026


Tarikh Terbitan : 2026-02-23

KERJA-KERJA MEMBEKAL DAN MEMASANG BAHARU SISTEM MANIFOLD KLORIN DAN SISTEM AUTO SHUT OFF, MEMBAIKPULIH SISTEM SCRUBBER SERTA KERJA-KERJA BERKAITAN DI LOJI RAWATAN AIR LUBUK BUNTAR, KEDAH DARUL AMAN (TAWARAN SEMULA)

Fail Berkaitan : SADA/SH/PGLN/12/2026


Tarikh Terbitan : 2026-02-23

KERJA-KERJA MEMBEKAL DAN MEMASANG BAHARU SISTEM PENGEDOSAN KLORIN BANK A DAN KERJA-KERJA PENYELENGGARAAN SISTEM AUTO OFF DAN SISTEM SCRUBBER SERTA KERJA-KERJA BERKAITAN DI LOJI RAWATAN AIR KULIM HI-TECH, KEDAH DARUL AMAN (TAWARAN SEMULA)

Fail Berkaitan : SADA/SH/PGLN/11/2026